ASG Consulting was appointed by a Right to Manage company to manage a complex remediation and construction-completion project for a residential apartment block in Liverpool.
As Employer’s Agent, ASG coordinated the contractors, project activities, regulatory requirements and client expectations from inception through to completion.
Part 01
Fire-damage remediation
Repairing and remediating fire-related damage across the roof, cladding and external façade of the block.
Part 02
Construction completion
Completing construction work on the building that had previously been left unfinished.
Scope of works
What the project covered
Fire-damage remediation
Replacement of the roof with a fire-resistant roofing system
Removal and replacement of potentially unsafe cladding
Repairs to fire-damaged external façade areas
Safety and security improvements
Improvement of existing security grilles
Coordination with Merseyside Fire and Rescue Service
Verification that remedial work met current fire-safety requirements
Completion of unfinished works
Completion of the passenger lift installation
Replacement of windows with more energy-efficient units
Interior improvements
Refurbishment of communal areas
Improvement of shared spaces for residents
Challenges & solutions
What made this project difficult
Remediation on an occupied block is as much a coordination problem as a construction one.
Managing multiple contractors
ASG coordinated several specialist contractors, each responsible for different parts of the project, keeping the programme aligned across every trade.
Reducing resident disruption
The work was completed in phases so that residents could continue living in their apartments throughout the renovation.
Regulatory compliance
ASG worked with local authorities and fire-safety services to ensure the completed work met relevant building and fire-safety standards.
Project outcomes
What the completed project delivered
Safer environment
A safer and more secure residential environment for everyone living in the block.
Better energy efficiency
Improved thermal performance through new, energy-efficient window units.
Lower maintenance costs
Reduced expected maintenance spend across the building’s key elements.
Increased property value
A stronger asset position for the apartment owners within the block.
Regulatory compliance
Compliance with applicable building and fire-safety requirements.
Residents kept in place
Phased delivery meant no decant people stayed in their homes throughout.